Showing posts with label Done. Show all posts
Showing posts with label Done. Show all posts

Friday, 7 March 2014

pre produc shooting schedule


Shooting Schedule

Day
Scene
Location
Equipment
Costumes
Props
Cast +Crew
1








2





3
2






1





1

King Edward's Rd Gascoigne estate



Robert Clack studio rooms





Robert Clack studio rooms

 Tripod
Camera





Tripod
Camera




Tripod
Camera
Dressing gown





t-shirt with image or logo on it, jeans



t-shirt with image or logo on it, jeans
Bread milk keys, wallet,





Microphone/stands, drum kit, bass and electric guitar, Amps x2 


Microphone/stands, drum kit, bass and electric guitar, Amps x2 

'Man'-Eddie HiltonCameraman- James Lucas
Cinematography- Harry Smith


lead singer-Eddie Hilton Cameraman/ bass guitar- James Lucas
Cinematography/drums- Harry Smith
Same for scene 1

aa

pre produc costumes and props


Costumes and Props


Character Name: 'Man'
Costume: shirt and tie, shoes coat, black trousers, dressing gown
Props: keys, wallet, bread, milk
Character Name: Lead singer
Costume: t-shirt with image or logo on it, jeans
Props: Microphone/stands, drum kit, bass and electric guitar, Amps x2 
Character Name: other band members
Costume: t-shirt with image or logo on it, jeans
Props: Same as lead singer

pre produc production budget



Production Budget
Item
Cost
  • Sony HDR-CX550VE (digital camcorder with two week hire)
  • Fluid Tripod (two week hire)
  •  Ibanez: GSR180 Electric Bass Guitar (Black)
  • Epiphone LP-100 Electric Guitar - Heritage Cherry Sunburst
  • Marshall MG15CF Guitar Amplifier Combo(X2)
  • Pearl TGC685C Target Complete Drum Set
  • 10% production contingency
  • £234.00+£275.00(deposit)
  •  -
  • £63.00+£45.00(deposit)
  • £149.00
  • £199.00
  • -
  • £80.00(X2)
  • -
  • £399.00
  • 152.40
Total Production Budget:
 £1524.00
+Contingency
£1676.40

pre produc risk assessment

Risk Assessment

Group Members: James Lucas, Sam harvey, Harry Smith and Eddie Hilton                     Location: King Edward's Rd Gascoigne estate
Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N
tripping on wires
ALL
3
3
3
Putting down cable cover mats.
Y

tripping on pavement
ALL
3
3
3
Giving a safety brief informing cast and crew of all hazards in area.
Y
 Roads
ALL
1
5
3
keep away from the edge of the pavement.
Y


 Falling off bridge



ALL



1



5



3
Giving a safety brief informing cast and crew of all hazards in area.



Y

Contacts
Emergency Service:        999
Robert Clack School:     02083728145
Other Contacts:       James: 02089347261

                                   Harry:  02083568726

pre product contingency plan



Contingency Plan
Name: Harry Smith
Production: Not My Day
Potential problems and how to overcome these problems:
  1. Poor weather, to resolve this problem make sure to check the weather report before going out to film and if bad weather is forecasted then reschedule the filming to another day.
  2. Running out of battery life during recording, this can be resolved by making sure that the camera is only on and recording when it is needed to be as well as keeping a spare battery to replace if the current one runs out.
  3. Filming people who do not want there faces to be seen, this can be resolved by either blurring out the faces (which would work for the matrix section) or making sure the area is relatively empty when we start filming.
  4. trip hazards from 'man' shots inc; pavement and bridge. This can be resolved by checking the filming location for hazards and giving the crew a safety brief informing them of all hazards in the area.
  5.  Trip hazard from band set with exposed wires and leads. This can be resolved by putting down cable cover mats e.g







Production Schedule cast and crew contact details




Production Schedule
Cast and Crew Contact Details

Programme Title: Not My Day
Client: Lost in Society
Writer: James Lucas
Date: 15/03/14

Name/Role
Mobile Telephone Number
Home Telephone Number
Harry Smith

Sam Harvey

James Lucas
-02083568726

-02074781908

-02089347261
-N/A

-N/A

-N/A

Production Schedule call sheet


Production Schedule
Call Sheet
Programme Title: Not My Day
Client: Lost in Society
Writer: James Lucas
Date: 15/03/14
CREW
Camera: Sam Harvey
Production Assistant: Harry Smith
Sound: James Lucas
Transport: N/A
Props: Harry Smith
Others: N/A
Actors: Harry Smith, Sam Harvey, James Lucas, Eddie Hilton.
Wardrobe: Harry Smith

Production Schedule location visit sheet


Production Schedule
Location Visit Sheet
Programme Title: Not My Day
Client: Lost in Society
Writer: James Lucas
Producer:  HnJentertainment
Director: Harry Smith
Date: 13/03/14
-studio rooms at our school for the band scenes



















-King Edward's Rd Gascoigne estate for the shots of the 'Man'
  
Flat interiour: bedroom, kitchen, hallway Flat exteriour: bus stop, bridge, pavement/road for the shots of the man

Access to location via: The shots are all in pubic places or in private property (the flat) that we have access to.
The studio rooms in robert clack school are easy to acsess for the length of normal working hours (9-5) and entering the school is easy via the entrances by swiping student passes.
 Health and Safety Issues to note:
  • trip hazards from 'Man' location inc; pavement edges, tripping/falling hazard on the bridge.
  • trip hazard from band set with exposed wires and leads.
Potential Filming Problems :

  • Poor weather
  • running out of battery life during recording
  • filming people who do not want there faces to be seen

Tuesday, 11 February 2014

T5- Pre- Production Planning (Proposal)





Proposal

Prepared by

Harry smith

 

HnJentertainment productions


11th March 2014

Client- Lost in Society

Copyright © 2014





Proposal

HnJentertainment productions has currently planned a 3 min 15 second long music video suitable for broadcasting. this music video is suitable for all ages however the music would be censored.


This music video will show a man going about a normal day but with problems that lead to them having a bad day in the form of various mistakes.

The advert will be recorded with Sony HDR-CX550VE and the budget will be approximately £1676.40

T4- Analyse the track



Lyrics
I know what you're thinkin'
But i don't know what to say
Everybodys leavin'
And i don't want to stay

I just want to go out yea,
i want to go away
lets's follow our hearts now
'cause i don't want to pray

I don't wanna be that
guy who's all alone
Trapped in his single room
Apartment with no phone
No, i don't wanna be that
Guy who's all alone
'cause today is not my day

Front door out of reach and
i think you're a mental case
the other side is freezin'
my life is such a waste

can we please just get out
would you just go away
Let's follow our hearts now
'cause i don't want to pray

I don't wanna be that
guy who's all alone
Trapped in his single room
Apartment with no phone
no, idon't wanna be that
guy who's all alone
'cause today is not my day

i know what you're thinkin'
But i don't know what you do
And everybody's leavin'
Look what you put me through

I don't wanna be that
guy who's all alone
Trapped in his single room
Apartment with no phone
no, i don't wanna be that
guy who's all alone
'cause today is not my day
No, today is not my day

No, i don't wanna be your nerd
no, i don't wanna be your
jockstrap-as*ho**
no, i don't wanna be your rock star boyfreind
'cause today is not my day
no. i don't wanna be your nerd
no, i don't wanna be your
rapper crapping douche bag
no, i don't wanna be your rock star boyfreind
'cause today is not my day

No, today is not my day
No, today is not my day
No, today is not my day

This song is played upbeat and energeticly with a relatively fast pace and is the adverage length for a song.
The song seems to be about a man who doesn't want to be left alone but he doesn't want to be with his girlfriend.
The imagery in this song includes a locked room and a padded cell.